Author : Andreas M B Gross
Publisher : Unknown
Page : 0 pages
File Size : 42,9 Mb
Release : 2022-12-31
Category : Electronic
ISBN : 3947982356
Controlled Demolition of the Bridge of Scientology by Andreas M B Gross Pdf
Our Goal is the Reconstruction of the Original. Analysis in what way each bridge step was messed up by revisions since the original bridge 1972. LRH disappeared on June 7, 1972, and has since lost control of the issue lines.