Author : Marion Terrill
Publisher : Unknown
Page : 128 pages
File Size : 43,7 Mb
Release : 2016-10-23
Category : Electronic
ISBN : 1925015920
Cost Overruns In Transport Infrastructure
Cost Overruns In Transport Infrastructure Book in PDF, ePub and Kindle version is available to download in english. Read online anytime anywhere directly from your device. Click on the download button below to get a free pdf file of Cost Overruns In Transport Infrastructure book. This book definitely worth reading, it is an incredibly well-written.
Policy and Planning for Large Infrastructure Projects
Author : Bent Flyvbjerg
Publisher : World Bank Publications
Page : 32 pages
File Size : 42,9 Mb
Release : 2005
Category : Economic development projects
ISBN : 8210379456XXX
Policy and Planning for Large Infrastructure Projects by Bent Flyvbjerg Pdf
Abstract: "This paper focuses on problems and their causes and cures in policy and planning for large infrastructure projects. First, it identifies as the main problem in major infrastructure development pervasive misinformation about the costs, benefits, and risks involved. A consequence of misinformation is massive cost overruns, benefit shortfalls, and waste. Second, the paper explores the causes of misinformation and finds that political-economic explanations best account for the available evidence: planners and promoters deliberately misrepresent costs, benefits, and risks in order to increase the likelihood that it is their projects, and not the competition's, that gain approval and funding. This results in the "survival of the unfittest," where often it is not the best projects that are built, but the most misrepresented ones. Finally, the paper presents measures for reforming policy and planning for large infrastructure projects, with a focus on better planning methods and changed governance structures, the latter being more important."--World Bank web site.
Large Infrastructure Projects in Germany
Author : Genia Kostka,Jobst Fiedler
Publisher : Springer
Page : 206 pages
File Size : 53,6 Mb
Release : 2016-05-23
Category : Social Science
ISBN : 9783319292335
Large Infrastructure Projects in Germany by Genia Kostka,Jobst Fiedler Pdf
This book presents an analysis of why some large infrastructure projects are delayed or compromised and offers important insights into the better delivery of future projects. It provides an important reaction to the ambitious €315 billion investment plan devised by the European Commission, wherein Europe's infrastructure is a key investment target. Germany is adopted as a focus, as Europe's largest economy, and a nation that has seen significant delays and tensions in the delivery of key infrastructure projects. The contributions to this volume demonstrate various patterns for infrastructure assets and illustrate how factors such as poor project governance, early planning mistakes, inappropriate risk management and unforeseen technological challenges influence delivery. The in-depth case studies on the Berlin Brandenburg Airport, the Hamburg Elbphilharmonie, and offshore wind parks show how project delivery can face massive problems, and illuminating solutions are offered to these problems. Overall, the case of Germany also offers the opportunity to assess various new forms of project delivery, such as public-private partnerships (PPP), and the risks and opportunities of ambitious first-mover 'pioneer' projects. The book will be of great interest for scholars and upper-level students of human geography, business and management, as well as policy makers.
Megaprojects and Risk
Author : Bent Flyvbjerg,Nils Bruzelius,Werner Rothengatter
Publisher : Cambridge University Press
Page : 226 pages
File Size : 50,7 Mb
Release : 2003-02-13
Category : Business & Economics
ISBN : 0521009464
Megaprojects and Risk by Bent Flyvbjerg,Nils Bruzelius,Werner Rothengatter Pdf
Megaprojects and Risk provides the first detailed examination of the phenomenon of megaprojects. It is a fascinating account of how the promoters of multi-billion dollar megaprojects systematically and self-servingly misinform parliaments, the public and the media in order to get projects approved and built. It shows, in unusual depth, how the formula for approval is an unhealthy cocktail of underestimated costs, overestimated revenues, undervalued environmental impacts and overvalued economic development effects. This results in projects that are extremely risky, but where the risk is concealed from MPs, taxpayers and investors. The authors not only explore the problems but also suggest practical solutions drawing on theory, experience and hard, scientific evidence from the several hundred projects in twenty nations and five continents that illustrate the book. Accessibly written, it will be the standard reference for students, scholars, planners, economists, auditors, politicians and interested citizens for many years to come.
An Analysis of Cost Overruns and Time Delays of INDOT Projects
Author : Claire Bordat,Kumares C. Sinha,Samuel Labi
Publisher : Unknown
Page : 128 pages
File Size : 42,9 Mb
Release : 2004-12-15
Category : Electronic
ISBN : 1622602013
An Analysis of Cost Overruns and Time Delays of INDOT Projects by Claire Bordat,Kumares C. Sinha,Samuel Labi Pdf
The Evaluation of Transportation Investment Projects
Author : Joseph Berechman
Publisher : Routledge
Page : 427 pages
File Size : 48,7 Mb
Release : 2010-05-26
Category : Business & Economics
ISBN : 9781135214081
The Evaluation of Transportation Investment Projects by Joseph Berechman Pdf
Throughout the world, the use of some kind of a formal transportation project evaluation procedure is a requirement. Yet, by and large, these are partial; in fact, much weight is often placed on the initial -pre-engineering -phases of the planning process, when vital information, such as accurate costs and demand projections, is largely missing. Moreover, many of these procedures neglect to consider key issues such as project’s risks, capital costs financing, latent demand, market imperfections, labor force availability and various incompatibilities between trip rates, travel times and activity location. As a result, projects, which are judged as viable under such deficient evaluation schemes, may have had a significantly different projection of capital costs and demand should a well-founded, thorough, and efficient evaluation process be used. Against this background, this book’s main objective is to construct a comprehensive and methodical economic, planning and decision-making framework for the evaluation of proposed transportation infrastructure investment projects. Such a framework is founded on four key principles. It is based on well-established economic, transportation and policy-analysis theoretical principles; it is comprehensive enough to encompass all relevant evaluation issues; it is applicable to a wide range of transportation investment projects; and it is amenable to empirical application including a sensitivity analysis and alternative scenarios regarding urban, regional and national developments.
Mega-Projects
Author : Alan A. Altshuler,David E. Luberoff
Publisher : Rowman & Littlefield
Page : 356 pages
File Size : 46,7 Mb
Release : 2004-05-13
Category : Political Science
ISBN : 0815701306
Mega-Projects by Alan A. Altshuler,David E. Luberoff Pdf
Since the demise of urban renewal in the early 1970s, the politics of large-scale public investment in and around major American cities has received little scholarly attention. In MEGA-PROJECTS, Alan Altshuler and David Luberoff analyze the unprecedented wave of large-scale (mega-) public investments that occurred in American cities during the 1950s and 1960s; the social upheavals they triggered, which derailed large numbers of projects during the late 1960s and early 1970s; and the political impulses that have shaped a new generation of urban mega-projects in the decades since. They also appraise the most important consequences of policy shifts over this half-century and draw out common themes from the rich variety of programmatic and project developments that they chronicle. The authors integrate narratives of national as well as state and local policymaking, and of mobilization by (mainly local) project advocates, with a profound examination of how well leading theories of urban politics explain the observed realities. The specific cases they analyze include a wide mix of transportation and downtown revitalization projects, drawn from numerous regions—most notably Boston, Denver, Los Angeles, New York City, Chicago, Atlanta, Dallas, Portland, and Seattle. While their original research focuses on highway, airport, and rail transit programs and projects, they draw as well on the work of others to analyze the politics of public investment in urban renewal, downtown retailing, convention centers, and professional sports facilities. In comparing their findings with leading theories of urban and American politics, Altshuler and Luberoff arrive at some surprising findings about which perform best and also reveal some important gaps in the literature as a whole. In a concluding chapter, they examine the potential effects of new fiscal pressures, business mobilization to relax environmental constraints, and security concerns in the wake of September 11. And they make clear their own views about how best to achieve a balance between developmental, environmental, and democratic values in public investment decisionmaking. Integrating fifty years of urban development history with leading theories of urban and American politics, MEGA-PROJECTS provides significant new insights into urban and intergovernmental politics.
The Oxford Handbook of Megaproject Management
Author : Bent Flyvbjerg
Publisher : Oxford University Press
Page : 625 pages
File Size : 51,7 Mb
Release : 2017
Category : Business & Economics
ISBN : 9780198732242
The Oxford Handbook of Megaproject Management by Bent Flyvbjerg Pdf
This handbook provides state-of-the-art scholarship in the emerging field of megaproject management. The 25 chapters cover all aspects of megaproject management, from front-end planning to actual project delivery, including how to deal with stakeholders, risk, finance, complexity, innovation, governance, ethics, project breakdowns, and scale itself.
International Handbook on Mega-Projects
Author : Hugo Priemus,Bert van Wee
Publisher : Edward Elgar Publishing
Page : 479 pages
File Size : 51,6 Mb
Release : 2013-11-29
Category : Business & Economics
ISBN : 9781781002308
International Handbook on Mega-Projects by Hugo Priemus,Bert van Wee Pdf
Providing crucial background information for those who want to understand decision-making processes on large transport infrastructure projects, this fascinating Handbook will prove an important source of information for academics, researchers and stude
Making Strategy
Author : Colin Eden,Fran Ackermann
Publisher : SAGE
Page : 518 pages
File Size : 50,8 Mb
Release : 2013-04-04
Category : Business & Economics
ISBN : 9781446265192
Making Strategy by Colin Eden,Fran Ackermann Pdf
This book approaches strategy-making in a way that is designed to assist most organizations develop strategy appropriate to their size, purpose and resources. It provides a much-needed guide to the strategy-making process by: elaborating the key concepts and theories of strategic management; by illustrating through case vignettes the issues inherent in the process of strategy-making; and by providing extensive and detailed practical guidelines on the methods, techniques and tools employed in the case vignettes. Key themes explored are: the crucial significance of political feasibility; the role of participation; emphasis on stakeholder management; thinking about alternative futures within the overall process of stra
Impact of Transport Infrastructure Investment on Regional Development
Author : OECD
Publisher : OECD Publishing
Page : 152 pages
File Size : 40,6 Mb
Release : 2002-05-23
Category : Electronic
ISBN : 9789264193529
Impact of Transport Infrastructure Investment on Regional Development by OECD Pdf
This report describes evaluation methods for transport infrastructure investments to ensure that scarce resources are allocated in a way that maximises their net return to society.
Project Cost Overrun
Author : Esbjörn Segelod
Publisher : Cambridge University Press
Page : 273 pages
File Size : 53,7 Mb
Release : 2017-11-23
Category : Business & Economics
ISBN : 9781107173040
Project Cost Overrun by Esbjörn Segelod Pdf
This book offers a new way of thinking about the causes and consequences of cost overrun to firms and society. It is ideal for academic researchers in project management, management accounting and corporate finance, as well as for managers in the private and public sectors.
The Infrastructure We Ride On
Author : Joseph Berechman
Publisher : Springer
Page : 194 pages
File Size : 47,7 Mb
Release : 2018-04-13
Category : Business & Economics
ISBN : 9783319746067
The Infrastructure We Ride On by Joseph Berechman Pdf
This book explores the various economic and institutional factors that explain why huge investments are made in unworthy transportation mega-projects in the US and other countries. It is based on research, the general literature, economic analyses, and results from a specifically collected database showing that a significant proportion of implemented mega-projects have been found to be inferior ex-ante or incapable of delivering the returns they promised ex-post. Transportation infrastructure and other public investments of a similar scope (“mega-projects”) reflect public sector priorities and objectives, non-pecuniary as well as financial constraints, and a range of decision-making processes. This book describes how decisions made in the public sector with respect to transportation infrastructure investments are affected by the large populations and territories they serve, the estimation of the substantial opportunity costs they entail, the formal procedures instituted for quantitatively appraising projected outcomes and monetary returns, and the political environment in which these decisions are made.
Cost Studies of Buildings
Author : Allan Ashworth,Srinath Perera
Publisher : Routledge
Page : 581 pages
File Size : 43,5 Mb
Release : 2013-09-13
Category : Business & Economics
ISBN : 9781317902935
Cost Studies of Buildings by Allan Ashworth,Srinath Perera Pdf
This practical guide to cost studies of buildings has been updated and revised throughout for the 5th edition. New chapters have been added on the RICS New Rules of Measurement (NRM) for order of cost estimating and elemental cost planning, and on the procurement of construction projects.
International Encyclopedia of Transportation
Author : Anonim
Publisher : Elsevier
Page : 4418 pages
File Size : 52,9 Mb
Release : 2021-05-13
Category : Law
ISBN : 9780081026724
International Encyclopedia of Transportation by Anonim Pdf
In an increasingly globalised world, despite reductions in costs and time, transportation has become even more important as a facilitator of economic and human interaction; this is reflected in technical advances in transportation systems, increasing interest in how transportation interacts with society and the need to provide novel approaches to understanding its impacts. This has become particularly acute with the impact that Covid-19 has had on transportation across the world, at local, national and international levels. Encyclopedia of Transportation, Seven Volume Set - containing almost 600 articles - brings a cross-cutting and integrated approach to all aspects of transportation from a variety of interdisciplinary fields including engineering, operations research, economics, geography and sociology in order to understand the changes taking place. Emphasising the interaction between these different aspects of research, it offers new solutions to modern-day problems related to transportation. Each of its nine sections is based around familiar themes, but brings together the views of experts from different disciplinary perspectives. Each section is edited by a subject expert who has commissioned articles from a range of authors representing different disciplines, different parts of the world and different social perspectives. The nine sections are structured around the following themes: Transport Modes; Freight Transport and Logistics; Transport Safety and Security; Transport Economics; Traffic Management; Transport Modelling and Data Management; Transport Policy and Planning; Transport Psychology; Sustainability and Health Issues in Transportation. Some articles provide a technical introduction to a topic whilst others provide a bridge between topics or a more future-oriented view of new research areas or challenges. The end result is a reference work that offers researchers and practitioners new approaches, new ways of thinking and novel solutions to problems. All-encompassing and expertly authored, this outstanding reference work will be essential reading for all students and researchers interested in transportation and its global impact in what is a very uncertain world. Provides a forward looking and integrated approach to transportation Updated with future technological impacts, such as self-driving vehicles, cyber-physical systems and big data analytics Includes comprehensive coverage Presents a worldwide approach, including sets of comparative studies and applications