Future Aircraft Carrier Options

Future Aircraft Carrier Options Book in PDF, ePub and Kindle version is available to download in english. Read online anytime anywhere directly from your device. Click on the download button below to get a free pdf file of Future Aircraft Carrier Options book. This book definitely worth reading, it is an incredibly well-written.

Future Aircraft Carrier Options

Author : Bradley Martin,Michael E. McMahon
Publisher : Unknown
Page : 112 pages
File Size : 48,6 Mb
Release : 2017
Category : History
ISBN : 0833099183

Get Book

Future Aircraft Carrier Options by Bradley Martin,Michael E. McMahon Pdf

This report is an exploration of possible alternatives to potentially replace the U.S. Navy's legacy aircraft carrier force as it begins reaching expected service life. This is neither a formal analysis of alternatives nor detailed engineering study.

Modernizing the U.S. Aircraft Carrier Fleet

Author : John Frederic Schank
Publisher : Rand Corporation
Page : 98 pages
File Size : 53,9 Mb
Release : 2005
Category : Aircraft carriers
ISBN : 083303720X

Get Book

Modernizing the U.S. Aircraft Carrier Fleet by John Frederic Schank Pdf

The U.S. Navy is currently designing the next generation aircraft carrier, the CVN 21. This class of carriers will use the same basic hull form as the current Nimitz class but will include a substantial redesign of the interior of the ship for improved weapons handling and stores management functions. It will also incorporate several new technologies including a new propulsion system and new aircraft launch and recovery systems. These improvements not only will increase the operational capability of the ship but also are anticipated to lower the ship's manpower requirements and maintenance costs. Under current force modernization plans, new ships of the CVN 21 class will be introduced every four or five years as the ships of the Nimitz class reach the end of their planned 50-year operational life. Under this strategy, Nimitz class carriers will be operating for over 50 more years and it will take decades to transform the aircraft carrier fleet to ships of the new class.On the basis of some preliminary calculations that appeared promising, RAND proposed to the Program Executive Office (PEO) for Aircraft Carriers an examination of a way to accelerate the transformation of the carrier force: replacing Nimitz-class carriers as they reach mid-life instead of refueling them. In this report we identify specific fleet management options for building new instead of refueling, and we evaluate their advantages and disadvantages. This report should be of interest to Navy and Office of Secretary of Defense planners examining fleet modernization options, especially those organizations addressing the costs of alternative force structure options.

Leveraging America's Aircraft Carrier Capabilities

Author : John Gordon
Publisher : Rand Corporation
Page : 134 pages
File Size : 49,5 Mb
Release : 2006
Category : History
ISBN : 9780833039224

Get Book

Leveraging America's Aircraft Carrier Capabilities by John Gordon Pdf

As the United States seeks ways to stretch its defense dollars, pursue the Global War on Terrorism, and meet other national-security challenges, it is highly likely that policymakers will increase their reliance on aircraft carriers, using them more often and in more situations than they have in the past, especially if the vessels have the additional capabilities to respond appropriately. The current and expected use of aircraft carriers led the United States Navy in fall 2004 to commission RAND to explore new and nontraditional ways that the United States might be able to employ aircraft carriers in pursuit of traditional and emerging military and homeland defense missions. Over six months, RAND created and convened two Concept Options Groups (COGs)-small groups of experienced military and civilian experts, defense analysts, and potential users who work together to identify promising ways to employ military might in nontraditional ways-to explore possible nontraditional roles for aircraft carriers. One COG explored and identified new ways that aircraft carriers could be used in combat operations; the second COG examined ways that the vessels could be used in noncombat, homeland security missions or to help the nation recover from terrorist attacks or natural disasters in U.S. territories. Among the combat recommendations to come from the COG insights are that abilities need to be enhanced to reconfigure carrier air wings; among noncombat recommendations are that the availability of nonready carriers to respond to unforeseen crises needs to be improved. This monograph summarizes the activities, findings, and recommendations of both carrier COGs. It should be of special interest to the Navy and to uniformed and civilian decisionmakers with responsibilities related to naval and carrier operations, maritime domain awareness, or homeland security.

Options for Reducing Costs in the United Kingdom's Future Aircraft Carrier (CVF) Programme

Author : John Frederic Schank,Roland J. Yardley,Jessie Riposo,Harry Thie,Edward G. Keating,J. L. Birkler,Mark V. Arena,Hans Pung
Publisher : Rand Corporation
Page : 184 pages
File Size : 52,5 Mb
Release : 2005
Category : Business & Economics
ISBN : 083303667X

Get Book

Options for Reducing Costs in the United Kingdom's Future Aircraft Carrier (CVF) Programme by John Frederic Schank,Roland J. Yardley,Jessie Riposo,Harry Thie,Edward G. Keating,J. L. Birkler,Mark V. Arena,Hans Pung Pdf

As the CVF Integrated Project Team continues to explore its many options, the researchers remain optimistic that, given several factors indicated, the CVF's targets can be reached."--BOOK JACKET.

Navy Ford (Cvn-78) Class Aircraft Carrier Program

Author : Congressional Service
Publisher : Createspace Independent Publishing Platform
Page : 88 pages
File Size : 50,7 Mb
Release : 2018-07-18
Category : Electronic
ISBN : 172325911X

Get Book

Navy Ford (Cvn-78) Class Aircraft Carrier Program by Congressional Service Pdf

CVN-78, CVN-79, CVN-80, and CVN-81 are the first four ships in the Navy's new Gerald R. Ford (CVN-78) class of nuclear-powered aircraft carriers (CVNs). CVN-78 (named for Gerald R. Ford) was procured in FY2008. The Navy's proposed FY2019 budget estimates the ship's procurement cost at $12,964.0 million (i.e., about $13.0 billion) in then-year dollars. The ship received advance procurement (AP) funding in FY2001-FY2007 and was fully funded in FY2008-FY2011 using congressionally authorized four-year incremental funding. To help cover cost growth on the ship, the ship received an additional $1,394.9 million in FY2014-FY2016 and FY2018 cost-to-complete procurement funding. The ship was delivered to the Navy on May 31, 2017, and was commissioned into service on July 22, 2017. CVN-79 (named for John F. Kennedy) was procured in FY2013. The Navy's proposed FY2019 budget estimates the ship's procurement cost at $11,341.4 million (i.e., about $11.3 billion) in then-year dollars. The ship received AP funding in FY2007-FY2012, and was fully funded in FY2013-FY2018 using congressionally authorized six-year incremental funding. The ship is scheduled for delivery to the Navy in September 2024. CVN-80 (named Enterprise) was procured in FY2018. The Navy's proposed FY2019 budget estimates the ship's procurement cost at $12,601.7 million (i.e., about $12.6 billion) in then-year dollars. The ship received AP funding in FY2016 and FY2017, and the Navy plans to fully fund the ship in FY2018-FY2023 using congressionally authorized six-year incremental funding. The Navy's proposed FY2019 budget requests $1,598.2 million in procurement funding for the ship. The ship is scheduled for delivery to the Navy in September 2027. CVN-81 (not yet named) is scheduled to be procured in FY2023. The Navy's proposed FY2019 budget estimates the ship's procurement cost at $15,088.0 million (i.e., about $15.1 billion) in then-year dollars. The Navy plans to request AP funding for the ship in FY2021 and FY2022, and then fully fund the ship in FY2023-FY2028 using congressionally authorized six-year incremental funding. The Navy's FY2019 budget submission programs the initial increment of AP funding for the ship in FY2021. The ship is scheduled for delivery to the Navy in September 2032. Oversight issues for Congress for the CVN-78 program for FY2019 include the following: whether to approve, reject, or modify the Navy's FY2019 procurement funding requests for the CVN-78 program; whether to accelerate the procurement of CVN-81 from FY2023 to an earlier year, or use a block buy contract to procure multiple aircraft carriers, or pursue a combined material buy for multiple aircraft carriers, or do some combination of these things; cost growth in the CVN-78 program, Navy efforts to stem that growth, and Navy efforts to manage costs so as to stay within the program's cost caps; whether to conduct the shock trial for the CVN-78 class in the near term, on the lead ship in the class, or years later, on the second ship in the class; CVN-78 program issues that were raised in a January 2018 report from the Department of Defense's (DOD's) Director of Operational Test and Evaluation (DOT&E); and whether the Navy should shift at some point from procuring large-deck, nuclear-powered carriers like the CVN-78 class to procuring smaller aircraft carriers.

Options for Funding Aircraft Carriers

Author : Anonim
Publisher : Unknown
Page : 0 pages
File Size : 54,8 Mb
Release : 2002
Category : Electronic
ISBN : OCLC:74232854

Get Book

Options for Funding Aircraft Carriers by Anonim Pdf

For over 40 years, Congress has funded the construction of U.S. Navy ships by appropriating enough money to pay for the entire construction project in the initial year of construction. This "full-funding" practice was undertaken to ensure that Congress was aware of the total cost of a project before it was begun and that one Congress would not bequeath to subsequent ones a choice between further appropriations and midcourse cancellation. The Navy begins construction of a new aircraft carrier every fourth or fifth year (on average), and the fully funded cost of a carrier can rep- resent a quarter or more of the total Navy shipbuilding budget. Because federal revenues do not increase by the cost of a carrier every fourth or fifth year, appropriating money for a carrier usually means reducing appropriations for something else that year for other shipbuilding efforts, other Navy programs, spending elsewhere in the Department of Defense (DoD), or outside DoD.

Navy Ford (CVN-78) Class Aircraft Carrier Program: Background and Issues for Congress

Author : Ronald Ronald O'Rourke,Congressional Research Congressional Research Service
Publisher : Unknown
Page : 70 pages
File Size : 55,8 Mb
Release : 2014-09-16
Category : Electronic
ISBN : 1502509342

Get Book

Navy Ford (CVN-78) Class Aircraft Carrier Program: Background and Issues for Congress by Ronald Ronald O'Rourke,Congressional Research Congressional Research Service Pdf

CVN-78, CVN-79, and CVN-80 are the first three ships in the Navy's new Gerald R. Ford (CVN-78) class of nuclear-powered aircraft carriers (CVNs).CVN-78 was procured in FY2008. The Navy's proposed FY2015 budget estimates the ship's procurement cost at $12,887.2 million (i.e., about $12.9 billion) in then-year dollars. The ship received advance procurement funding in FY2001-FY2007 and was fully funded in FY2008- FY2011 using congressionally authorized four-year incremental funding. The Navy did not request any procurement funding for the ship in FY2012 and FY2013. To help cover cost growth on the ship, the ship received an additional $588.1 million in procurement funding in FY2014, and the Navy is requesting another $663.0 million in procurement funding for FY2015.CVN-79 was procured in FY2013. The ship received advance procurement funding in FY2007- FY2012, and the Navy plans to fully fund the ship in FY2013-FY2018 using congressionally authorized six-year incremental funding. The Navy's proposed FY2015 budget estimates CVN- 79's procurement cost at $11,498.0 million (i.e., about $11.5 billion) in then-year dollars, and requests $1,300 million in procurement funding for the ship.CVN-80 is scheduled to be procured in FY2018. The Navy's proposed FY2015 budget estimates the ship's procurement cost at $13,874.2 million (i.e., about $13.9 billion) in then-year dollars. Under the Navy's proposed FY2015 budget, the ship is to receive advance procurement funding in FY2016-FY2017 and be fully funded in FY2018-FY2023 using congressionally authorized six-year incremental funding.

Options for the Navy's Future Fleet

Author : Eric Jackson Labs
Publisher : Unknown
Page : 120 pages
File Size : 54,8 Mb
Release : 2006
Category : Government publications
ISBN : PURD:32754076795933

Get Book

Options for the Navy's Future Fleet by Eric Jackson Labs Pdf

Navy Ford (CVN-78) Class Aircraft Carrier Program

Author : Ronald O'Rourke
Publisher : Unknown
Page : 104 pages
File Size : 40,9 Mb
Release : 2019-10-20
Category : Electronic
ISBN : 1701354985

Get Book

Navy Ford (CVN-78) Class Aircraft Carrier Program by Ronald O'Rourke Pdf

CVN-78, CVN-79, CVN-80, and CVN-81 are the first four ships in the Navy's new Gerald R. Ford (CVN-78) class of nuclear-powered aircraft carriers (CVNs). This in-depth illustrated volume discusses technical issues, fleet planning, budgeting, and delays in the Ford Class program.

Questioning the Carrier

Author : Jeff Vandenengel
Publisher : Naval Institute Press
Page : 312 pages
File Size : 40,9 Mb
Release : 2023-11-15
Category : Transportation
ISBN : 9781557502575

Get Book

Questioning the Carrier by Jeff Vandenengel Pdf

The nuclear-powered aircraft carrier is naval history’s most powerful and versatile warship. It is the reason the U.S. Navy is the predominant force at sea today. Throughout its illustrious history, the carrier has overcome serious flaws, including its expense, vulnerability, centralization of combat power, and its airwing’s short range. The U.S. Navy always accepted those flaws because the carrier was the best means of delivering firepower. Today’s technologies, however, provide key opportunities for the U.S. Navy to move beyond the limitations of a carrier-centric fleet by redesigning its force structure. Questioning the Carrier examines how the U.S. Navy can embrace the Age of the Missile, network the distributed fleet, and diversify to develop a fleet that benefits from the aircraft carrier’s many strengths without being wholly dependent on them. By acting on those opportunities, the U.S. Navy can develop a structure that performs the carrier-centric fleet’s functions more effectively using a force consisting of more platforms with less total risk and within the same long-term budget. As adversaries are improving their ability to deter the carrier thus causing its utility to wane, the author examines the Navy’s past successes to show how it can overcome institutional resistance to change and continue to rule the seas.

Options for Reducing the Deficit

Author : United States. Congressional Budget Office
Publisher : Unknown
Page : 320 pages
File Size : 53,6 Mb
Release : 2013
Category : Budget deficits
ISBN : MINN:31951D03758890X

Get Book

Options for Reducing the Deficit by United States. Congressional Budget Office Pdf

From the Introduction: This volume presents 103 options that would decrease federal spending of increase federal revenues over the next decade. Those options cover many areas-ranging from defense to energy, Social Security, and provisions of the tax code. The budgetary effects identified for most of the options span the 10 years from 2014 to 2023 (the period covered by CBO's May 2013 baseline budget projections), although many of the options would have longer-term effects as well. Chapters 2 through 5 present options in the following categories: Chapter 2: Mandatory spending other than that for health-related programs; Chapter 3: Discretionary spending other than that for health-related programs, Chapter 4: revenues other than those related to health; Chapter 5: Health-related programs and revenue provisions. In addition to 11 options that are similar in scope to others in this volume, Chapter 5 includes 5 broad approaches for reducing spending on health care programs or revenues forgone because of tax provisions related to health care. Each would offer lawmakers a variety of possibilities for making changes in current laws. Chapter 6 differs from the rest of the volume; it discusses the challenges and the potential budgetary effects of eliminating a cabinet department.

Future Carrier and Joint Combat Aircraft Programmes

Author : Great Britain: Parliament: House of Commons: Defence Committee
Publisher : The Stationery Office
Page : 114 pages
File Size : 50,6 Mb
Release : 2005-12-21
Category : Technology & Engineering
ISBN : 021502673X

Get Book

Future Carrier and Joint Combat Aircraft Programmes by Great Britain: Parliament: House of Commons: Defence Committee Pdf

The Ministry of Defence plans to replace the Royal Navy's current strength of three aircraft carriers with two larger, more versatile carriers capable of carrying a more powerful force, including new aircraft to replace the Harrier. This report analyses the progress of the Future Carrier and related Joint Combat Aircraft programmes. There is a serious risk that the two carriers will not enter service in 2012 and 2015 as planned, due to delays in investment decision-making. The novel 'Alliance' between MoD and three commercial companies has not yet been finalised. Delays are already impacting UK shipyards, and threatening jobs and the survival of the yards.The Joint Strike Fighter, a US-led programme, is the aircraft of choice for the new carriers, but there are unresolved weight problems. The target In-Service Date has been put back from 2012 to 2014, so it is possible that the new carrier would be operational (in 2012) before the new aircraft is available. There must be adequate assurances that the UK will have access to all the relevant technology (the 'Sovereign Capability') to enable maintenance and upgrading of new aircraft. Otherwise, the UK should consider withdrawing from the Fighter programme.

Options for reducing the deficit

Author : Anonim
Publisher : Unknown
Page : 320 pages
File Size : 54,8 Mb
Release : 2013
Category : Electronic
ISBN : RUTGERS:39030041187446

Get Book

Options for reducing the deficit by Anonim Pdf

The Eyes of the Fleet

Author : Obaid Younossi
Publisher : Rand Corporation
Page : 85 pages
File Size : 46,8 Mb
Release : 2002
Category : Political Science
ISBN : 0833031546

Get Book

The Eyes of the Fleet by Obaid Younossi Pdf

The E-2C Hawkeye is the US Navy's airborne early-warning aircraft and an integral component of the Navy's carrier air wing. The Navy soon has to decide whether to buy new aircraft, retrofit old aircraft or refurbish them to extend their service lives. This work covers these options.