Navy Ford Cvn 78 Class Cvn 21 Aircraft Carrier Program

Navy Ford Cvn 78 Class Cvn 21 Aircraft Carrier Program Book in PDF, ePub and Kindle version is available to download in english. Read online anytime anywhere directly from your device. Click on the download button below to get a free pdf file of Navy Ford Cvn 78 Class Cvn 21 Aircraft Carrier Program book. This book definitely worth reading, it is an incredibly well-written.

Navy Ford (CVN-78) Class (CVN-21) Aircraft Carrier Program

Author : Ronald O'Rourke,Library of Congress. Congressional Research Service
Publisher : Unknown
Page : 6 pages
File Size : 51,5 Mb
Release : 2008
Category : Aircraft carriers
ISBN : OCLC:459787730

Get Book

Navy Ford (CVN-78) Class (CVN-21) Aircraft Carrier Program by Ronald O'Rourke,Library of Congress. Congressional Research Service Pdf

Navy Ford (CVN-78) Class Aircraft Carrier Program

Author : Ronald O'Rourke
Publisher : Unknown
Page : 104 pages
File Size : 54,6 Mb
Release : 2019-10-20
Category : Electronic
ISBN : 1701354985

Get Book

Navy Ford (CVN-78) Class Aircraft Carrier Program by Ronald O'Rourke Pdf

CVN-78, CVN-79, CVN-80, and CVN-81 are the first four ships in the Navy's new Gerald R. Ford (CVN-78) class of nuclear-powered aircraft carriers (CVNs). This in-depth illustrated volume discusses technical issues, fleet planning, budgeting, and delays in the Ford Class program.

Navy Ford (Cvn-78) Class Aircraft Carrier Program

Author : Congressional Service
Publisher : Createspace Independent Publishing Platform
Page : 88 pages
File Size : 43,8 Mb
Release : 2018-07-18
Category : Electronic
ISBN : 172325911X

Get Book

Navy Ford (Cvn-78) Class Aircraft Carrier Program by Congressional Service Pdf

CVN-78, CVN-79, CVN-80, and CVN-81 are the first four ships in the Navy's new Gerald R. Ford (CVN-78) class of nuclear-powered aircraft carriers (CVNs). CVN-78 (named for Gerald R. Ford) was procured in FY2008. The Navy's proposed FY2019 budget estimates the ship's procurement cost at $12,964.0 million (i.e., about $13.0 billion) in then-year dollars. The ship received advance procurement (AP) funding in FY2001-FY2007 and was fully funded in FY2008-FY2011 using congressionally authorized four-year incremental funding. To help cover cost growth on the ship, the ship received an additional $1,394.9 million in FY2014-FY2016 and FY2018 cost-to-complete procurement funding. The ship was delivered to the Navy on May 31, 2017, and was commissioned into service on July 22, 2017. CVN-79 (named for John F. Kennedy) was procured in FY2013. The Navy's proposed FY2019 budget estimates the ship's procurement cost at $11,341.4 million (i.e., about $11.3 billion) in then-year dollars. The ship received AP funding in FY2007-FY2012, and was fully funded in FY2013-FY2018 using congressionally authorized six-year incremental funding. The ship is scheduled for delivery to the Navy in September 2024. CVN-80 (named Enterprise) was procured in FY2018. The Navy's proposed FY2019 budget estimates the ship's procurement cost at $12,601.7 million (i.e., about $12.6 billion) in then-year dollars. The ship received AP funding in FY2016 and FY2017, and the Navy plans to fully fund the ship in FY2018-FY2023 using congressionally authorized six-year incremental funding. The Navy's proposed FY2019 budget requests $1,598.2 million in procurement funding for the ship. The ship is scheduled for delivery to the Navy in September 2027. CVN-81 (not yet named) is scheduled to be procured in FY2023. The Navy's proposed FY2019 budget estimates the ship's procurement cost at $15,088.0 million (i.e., about $15.1 billion) in then-year dollars. The Navy plans to request AP funding for the ship in FY2021 and FY2022, and then fully fund the ship in FY2023-FY2028 using congressionally authorized six-year incremental funding. The Navy's FY2019 budget submission programs the initial increment of AP funding for the ship in FY2021. The ship is scheduled for delivery to the Navy in September 2032. Oversight issues for Congress for the CVN-78 program for FY2019 include the following: whether to approve, reject, or modify the Navy's FY2019 procurement funding requests for the CVN-78 program; whether to accelerate the procurement of CVN-81 from FY2023 to an earlier year, or use a block buy contract to procure multiple aircraft carriers, or pursue a combined material buy for multiple aircraft carriers, or do some combination of these things; cost growth in the CVN-78 program, Navy efforts to stem that growth, and Navy efforts to manage costs so as to stay within the program's cost caps; whether to conduct the shock trial for the CVN-78 class in the near term, on the lead ship in the class, or years later, on the second ship in the class; CVN-78 program issues that were raised in a January 2018 report from the Department of Defense's (DOD's) Director of Operational Test and Evaluation (DOT&E); and whether the Navy should shift at some point from procuring large-deck, nuclear-powered carriers like the CVN-78 class to procuring smaller aircraft carriers.

Navy Ford (CVN-78) Class Aircraft Carrier Program: Background and Issues for Congress

Author : Ronald Ronald O'Rourke,Congressional Research Congressional Research Service
Publisher : Unknown
Page : 70 pages
File Size : 51,9 Mb
Release : 2014-09-16
Category : Electronic
ISBN : 1502509342

Get Book

Navy Ford (CVN-78) Class Aircraft Carrier Program: Background and Issues for Congress by Ronald Ronald O'Rourke,Congressional Research Congressional Research Service Pdf

CVN-78, CVN-79, and CVN-80 are the first three ships in the Navy's new Gerald R. Ford (CVN-78) class of nuclear-powered aircraft carriers (CVNs).CVN-78 was procured in FY2008. The Navy's proposed FY2015 budget estimates the ship's procurement cost at $12,887.2 million (i.e., about $12.9 billion) in then-year dollars. The ship received advance procurement funding in FY2001-FY2007 and was fully funded in FY2008- FY2011 using congressionally authorized four-year incremental funding. The Navy did not request any procurement funding for the ship in FY2012 and FY2013. To help cover cost growth on the ship, the ship received an additional $588.1 million in procurement funding in FY2014, and the Navy is requesting another $663.0 million in procurement funding for FY2015.CVN-79 was procured in FY2013. The ship received advance procurement funding in FY2007- FY2012, and the Navy plans to fully fund the ship in FY2013-FY2018 using congressionally authorized six-year incremental funding. The Navy's proposed FY2015 budget estimates CVN- 79's procurement cost at $11,498.0 million (i.e., about $11.5 billion) in then-year dollars, and requests $1,300 million in procurement funding for the ship.CVN-80 is scheduled to be procured in FY2018. The Navy's proposed FY2015 budget estimates the ship's procurement cost at $13,874.2 million (i.e., about $13.9 billion) in then-year dollars. Under the Navy's proposed FY2015 budget, the ship is to receive advance procurement funding in FY2016-FY2017 and be fully funded in FY2018-FY2023 using congressionally authorized six-year incremental funding.

Cvn-78 Gerald R. Ford, U.s. Navy Aircraft Carrier

Author : W. Frederick Zimmerman
Publisher : Nimble Books LLC
Page : 32 pages
File Size : 49,5 Mb
Release : 2007-11-01
Category : History
ISBN : 9781934840023

Get Book

Cvn-78 Gerald R. Ford, U.s. Navy Aircraft Carrier by W. Frederick Zimmerman Pdf

A unique keepsake with beautiful images and interesting information about the U.S. Navy's newest aircraft carrier, CVN-78 Gerald R. Ford. A perfect gift for anyone interested in aircraft carriers, the Navy, or President Ford.

Modernizing the U.S. Aircraft Carrier Fleet

Author : John Frederic Schank
Publisher : Rand Corporation
Page : 98 pages
File Size : 55,9 Mb
Release : 2005
Category : Aircraft carriers
ISBN : 083303720X

Get Book

Modernizing the U.S. Aircraft Carrier Fleet by John Frederic Schank Pdf

The U.S. Navy is currently designing the next generation aircraft carrier, the CVN 21. This class of carriers will use the same basic hull form as the current Nimitz class but will include a substantial redesign of the interior of the ship for improved weapons handling and stores management functions. It will also incorporate several new technologies including a new propulsion system and new aircraft launch and recovery systems. These improvements not only will increase the operational capability of the ship but also are anticipated to lower the ship's manpower requirements and maintenance costs. Under current force modernization plans, new ships of the CVN 21 class will be introduced every four or five years as the ships of the Nimitz class reach the end of their planned 50-year operational life. Under this strategy, Nimitz class carriers will be operating for over 50 more years and it will take decades to transform the aircraft carrier fleet to ships of the new class.On the basis of some preliminary calculations that appeared promising, RAND proposed to the Program Executive Office (PEO) for Aircraft Carriers an examination of a way to accelerate the transformation of the carrier force: replacing Nimitz-class carriers as they reach mid-life instead of refueling them. In this report we identify specific fleet management options for building new instead of refueling, and we evaluate their advantages and disadvantages. This report should be of interest to Navy and Office of Secretary of Defense planners examining fleet modernization options, especially those organizations addressing the costs of alternative force structure options.

Defense Acquisitions

Author : United States Government Accountability Office
Publisher : Createspace Independent Publishing Platform
Page : 58 pages
File Size : 51,7 Mb
Release : 2017-09-13
Category : Electronic
ISBN : 1976361397

Get Book

Defense Acquisitions by United States Government Accountability Office Pdf

The Navy is investing over $3 billion to develop technologies for a new type of aircraft carrier-the Ford class-and it expects to spend almost $11 billion to design and construct the USS Gerald R. Ford (CVN 78)-the lead ship of the class. New technologies are to improve the carrier's performance and reduce crew size. The Navy requested authorization of CVN 78 in its fiscal year 2008 budget. GAO was asked to assess the Navy's ability to meet its goals for developing the new carrier. Specifically, this report assesses (1) the extent to which technology development could affect the capability and construction of CVN 78, (2) the status of efforts to achieve design stability, and (3) the challenges to building CVN 78 within budget. To accomplish this, our work includes analysis of test reports, development schedules, and ship progress reviews; interviews with Navy and other officials; and examinations of cost estimates and our own past work.

Ford-Class Aircraft Carrier, Follow-On Ships Need More Frequent and Accurate Cost Estimates to Avoid Pitfalls of Lead Ship

Author : U. S. Government Accountability Office
Publisher : Createspace Independent Publishing Platform
Page : 56 pages
File Size : 54,6 Mb
Release : 2017-07-11
Category : Electronic
ISBN : 1548805114

Get Book

Ford-Class Aircraft Carrier, Follow-On Ships Need More Frequent and Accurate Cost Estimates to Avoid Pitfalls of Lead Ship by U. S. Government Accountability Office Pdf

" The Navy intended for the Ford Class aircraft carrier to improve combat capability while reducing acquisition and life-cycle costs. However, as GAO has reported on extensively since 2007, the lead ship has experienced cost growth of nearly 23 percent, with a reduced capability expected at delivery. CVN 78 is estimated to cost $12.9 billion, while the next ship, CVN 79, is estimated to be $11.4 billion. The Navy plans to buy 1-2 more ships in the coming years. The Senate Armed Services Committee Report accompanying the National Defense Authorization Act for Fiscal Year 2016 included a provision that GAO review Ford-class cost estimates, among related issues. This report assesses: (1) the extent to which the CVN 79 cost estimate is a reliable basis for meeting the cost cap and addresses known cost risks from the lead ship, and (2) the extent to which oversight mechanisms provide Congress with insight into ship costs. To do this work, GAO compared the CVN 79 cost estimate with GAO's Cost Estimating and Assessment Guide, analyzed cost reports, and interviewed relevant officials. "

United States Navy

Author : Aune Felicity Krizman
Publisher : Nova Snova
Page : 0 pages
File Size : 47,9 Mb
Release : 2019
Category : History
ISBN : 1536147680

Get Book

United States Navy by Aune Felicity Krizman Pdf

This book provides background information and potential oversight issues for Congress on the Columbia-class program, the Gerald R. Ford (CVN-78) class aircraft carrier program, the Navy's FFG(X) program, on the Navy's Littoral Combat Ship (LCS) program and on three new ship-based weapons the Navy is developing that could improve the ability of Navy surface ships to defend themselves against missiles, unmanned aerial vehicles (UAVs), and surface craft: the Surface Navy Laser Weapon System (SNLWS), the electromagnetic railgun (EMRG), and the gun-launched guided projectile (GLGP), previously known as the hypervelocity projectile (HVP).

Department of Defense Authorization for Appropriations for Fiscal Year 2014 and the Future Years Defense Program: Seapower

Author : United States. Congress. Senate. Committee on Armed Services
Publisher : Unknown
Page : 150 pages
File Size : 51,5 Mb
Release : 2014
Category : Military research
ISBN : PURD:32754083751556

Get Book

Department of Defense Authorization for Appropriations for Fiscal Year 2014 and the Future Years Defense Program: Seapower by United States. Congress. Senate. Committee on Armed Services Pdf

Navy Program Guide

Author : United States. Department of the Navy
Publisher : Unknown
Page : 182 pages
File Size : 50,9 Mb
Release : 2010
Category : Electronic
ISBN : RUTGERS:39030036832139

Get Book

Navy Program Guide by United States. Department of the Navy Pdf

Seaforth World Naval Review 2019

Author : Conrad Waters
Publisher : Seaforth Publishing
Page : 194 pages
File Size : 50,8 Mb
Release : 2018-10-30
Category : History
ISBN : 9781526745880

Get Book

Seaforth World Naval Review 2019 by Conrad Waters Pdf

Now celebrating its tenth edition, _World Naval Review_ provides an affordable but yet authoritative summary of global naval developments over the past 12 months. Regional surveys of fleet evolution and procurement by editor Conrad Waters are supplemented by in-depth articles from a range of subject experts focusing on significant new warships, technological advances and specific navies. Features in this edition include extended reviews of the new aircraft carriers USS _Gerald R. Ford_ and HMS _Queen Elizabeth_, the largest ships ever to serve in their respective fleets. Technological subjects include assessments of naval communications by Norman Friedman and autonomous systems by Richard Scott, whilst David Hobbs’ usual review of naval aviation is expanded to include a broader analysis of key trends over the last decade. Meanwhile, reviews of specific fleets focus on the navies of Canada, Peru and Singapore, all medium-sized naval powers at critical – if very different – phases of their development. Firmly established as providing the only annual naval overview of its type, World Naval Review is essential reading for anyone – whether enthusiast or professional – interested in contemporary maritime affairs.

Navy Nuclear-Powered Surface Ships

Author : Ronald O'Rourke
Publisher : DIANE Publishing
Page : 33 pages
File Size : 42,8 Mb
Release : 2010-10
Category : Technology & Engineering
ISBN : 9781437925173

Get Book

Navy Nuclear-Powered Surface Ships by Ronald O'Rourke Pdf

Contents: (1) Intro. and Issue for Congress; (2) Background: Nuclear and Conventional Power for Ships; Nuclear Power for a Surface Combatant; Naval Nuclear Propulsion Program; Current Navy Nuclear-Powered Ships; CG(X) Cruiser Program; Reactor Plant for a Nuclear-Powered CG(X); Construction Shipyards; Nuclear-Capable Shipyards; Surface Combatant Shipyards; 2006 Navy Alternative Propulsion Study; (3) Potential Issues for Congress: Cost; Development and Design Cost; Procurement Cost; Operational Effectiveness; Ship Construction; Shipyards; Nuclear-Propulsion Component Manufacturers; Environmental Impact; (4) Potential Options for Congress; (5) Legislative Activity for FY 2010. Charts and tables.

Surface Combatant Construction Update

Author : United States. Congress. House. Committee on Armed Services. Seapower and Expeditionary Forces Subcommittee
Publisher : Unknown
Page : 144 pages
File Size : 40,7 Mb
Release : 2008
Category : Shipbuilding
ISBN : PSU:000065512692

Get Book

Surface Combatant Construction Update by United States. Congress. House. Committee on Armed Services. Seapower and Expeditionary Forces Subcommittee Pdf